Published on: 2026-04-28
Source: Moscow Exchange – Московская Биржа –
An important disclaimer is at the bottom of this article.
To the participants of the trades
We inform you that in accordance with Part I. General Part, Part II. Stock Market Section of the Rules for conducting trading on the stock market, deposit market, and credit market of PJSC “Moscow Exchange MICEX-RTS”, approved by the decision of the Supervisory Board of PJSC Moscow Exchange on January 23, 2026 (Protocol No. 11), and based on the notification of buyback received from LLC “Arlift Interneshnl”, the following forms, time, duration, and procedure for conducting the acquisition of bonds of LLC “Arlift Interneshnl” in the “Buyback: Targeted Applications” trading mode are established:
| Name of the Issuer | LLC “Arlift International” | ||
| Name of the security | Exchange-traded interest non-convertible unsecured bond series BO-01 | ||
| Registration number of the release | 4B02-01-00148-L | ||
| Trading code | RU000A108DP9 | ||
| ISIN | RU000A108DP9 | ||
| Information about acquisition (trading mode, acquisition form) | With a preliminary collection of targeted applications with an activation date in the trading mode “Buyout: Targeted Applications”. (Calculations: Rubles) |
||
| Calculation code | T0 | ||
| Purchase price | 100% of the nominal value of the Bond | ||
| Name of the Agent purchasing the bonds | GrottBärn (JSC) (Identifier in the trading system – EC0276600000) |
||
| Lot size | 1 Bond | ||
| Application submission start date | 28.04.2026 | ||
| Application deadline | 04.05.2026 | ||
| Application activation and deal conclusion date | 14.05.2026 | ||
| Application submission time in the application submission period | Application collection date | Start time for application submission | Application deadline |
| 28.04.2026 | 10:00 | 18:00 | |
| 29.04.2026 | 10:00 | 18:00 | |
| 30.04.2026 | 10:00 | 18:00 | |
| 04.05.2026 | 10:00 | 18:00 | |
| Application activation time | 10:00 | ||
| Trading time in the period of order satisfaction | Date of application satisfaction | Start time of satisfaction applications |
Application satisfaction deadline |
| 14.05.2026 | 10:10 | 18:30 | |
| Additional conditions | Application withdrawal is allowed during the application submission period. The procedure for control assurance of an application submitted during the application collection period is carried out at the moment of activation of such an application. Applications for the sale of Bonds are submitted with the following mandatory requisites: – activation date (this requisition of the application is filled in automatically in the format “DDMMYYYY” by the trading system); – the number of securities in the lot (the maximum number of securities that the potential seller of the lot could sell); – calculation code; – price, as a percentage of the nominal value of the Bonds; – other mandatory details established by the Trading Rules. |
||
Please note; this information is raw content obtained directly from the information source. It represents an accurate report of what the source claims and does not necessarily reflect the position of MIL-OSI or its clients.