Published on: 2026-06-23
Source: KAMAZ – An important disclaimer is at the bottom of this article.
As part of the project for the transformation and localization of production at JSC “VIS” (an enterprise of the OAT Group, included in the structure of “KAMAZ”), a section modernization was carried out.
In order to reduce time for logistics on the territory of JSC “VIS”, the transfer of welding sections of pedal brackets and hand brake levers was carried out.“Transfer of production sites is a key decision in the strategy to optimize our production. Consolidation of related operations within a single production space will allow us to significantly reduce internal logistics, speed up component processing, and increase overall operational efficiency.”, – notedGeneral Director of the managing company JSC “OAT” Evgeny Rotman.
The company expects a reduction in the time for moving parts between production stages, which will directly affect the reduction of costs and improvement of delivery times.
Please note; this information is raw content received directly from the information source. It represents an accurate report of what the source claims and does not necessarily reflect the position of MIL-OSI or its clients.