Post

Heating turned on in more than half of social facilities and more than 40 percent of residential buildings

Heating turned on in more than half of social facilities and more than 40 percent of residential buildings

Published on: 2026-10-01

Source: Moscow Government – Московское правительство –

An important disclaimer is at the bottom of this article.

The heating season in the capital began on October 1. Currently, more than 40 percent of residential buildings and over 50 percent of significant social facilities are receiving heat, said the Deputy Mayor of Moscow for Housing and Communal Services and Improvement. Petr Biryukov.

“Specialists of the urban utilities complex have today started activities to switch the heating system to winter mode, organizing heat supply to city facilities, primarily to social institutions and apartment buildings. All work is proceeding normally and according to schedule; as of 6:00 PM on October 1, heating has been turned on in more than 40 percent of homes and more than 50 percent of social facilities,” noted Petr Biryukov.

The supply of the heat carrier is carried out in stages — heating is switched on at all city facilities over several days. First, heat is provided to social institutions, apartment buildings, and office buildings, then to trade and industrial enterprises.

A total of more than 74 thousand facilities were prepared for the autumn-winter period, including over 34 thousand residential buildings. All work was completed within the established deadline — by September 1. From May to September, hydraulic and temperature tests of heating networks were carried out, which helped to identify unreliable sections in advance and repair them.

Head urban infrastructure complex he emphasized that the necessary maintenance work had been carried out on more than 130 thousand kilometers of electrical networks, about 3.5 thousand kilometers of gas pipelines, over 13.2 thousand kilometers of water supply networks, and 9.8 thousand kilometers of sewer networks. The required number of emergency teams have been formed.

Heating has started to be turned on in Moscow

The mos.ru portal presents a large-scale special project, dedicated to the development of key sectors of Moscow. Among them are transport, industry, healthcare, education, sports, and construction. The special project helps to learn how the capital has changed over the past years, what initiatives aimed at making citizens’ lives even more comfortable are currently being implemented, and what awaits Moscow and its residents in the near future.

On the project page “Public Utilities Infrastructure” you can learn about how engineering communications are being developed and updated in the capital, how the separate waste collection system operates, and the unified city management system.

Quickly get the main news on the official channels of the city of Moscow in messengers “Max” and “Telegram”.

Please note; This information is raw content received directly from the information source. It is an accurate report of what the source claims and does not necessarily reflect the position of MIL-OSI or its clients.