Post

Marat Khusnullin: “The ‘Single Customer’ has completed the construction and reconstruction of more than 30 sports facilities.”

Marat Khusnullin: “The ‘Single Customer’ has completed the construction and reconstruction of more than 30 sports facilities.”

Published on: 2026-08-07

Source: Government of the Russian Federation –

An important disclaimer is at the bottom of this article.

“Creating modern conditions for sports activities helps make training more accessible, strengthens the nation’s health, and unites people around common values. Across the country, the construction of modern sports complexes continues, including stadiums, aquatic centers, and youth sports institutions. And despite all difficulties, the work does not stop. Since 2021, the ‘Unified Customer’ has completed the construction and renovation of more than 30 sports facilities. This includes 13 facilities of federal significance and more than 20 sports infrastructure objects in Donbass and Novorossiya. More than 60 other facilities are currently under construction,” said Marat Khusnullin.

Sports and health complex in Mariupol.

For example, in Alushta, two new buildings of the Federal Training Center for the Sports Preparation of the Russian National Teams “Crimean” have been introduced. In Mariupol, the sports stadiums “Zapadny”, “Portovik”, and “Olimp” have been restored and renovated.

In addition, dozens of sports halls in general education schools have been renovated, and youth sports schools have been comprehensively modernized.

Extensive work is underway in Omsk, where builders have started the finishing works in the ice complex under construction for the Siberian State University of Physical Culture and Sports.

Training and sports complex for athletics and football of the Volgograd State Academy of Physical Culture, Volgograd.

“The modern sports facility, covering an area of more than 5,000 square meters, consists of two interconnected blocks: an ice arena with artificial ice and a three-story administrative and utility building. The arena will be equipped with telescopic stands for 200 spectators, and the administrative building will house skate rental and sharpening rooms, a medical office, an equipment repair workshop, staff offices, and other spaces. Upon completion, the new indoor rink will become the leading venue for university student training and hosting local-level competitions in hockey, figure skating, and short track speed skating,” said Karen Oganesyan, General Director of PPK “Unified Customer.”

Please note; This information is raw content obtained directly from the information source. It is an accurate report of what the source claims and does not necessarily reflect the position of MIL-OSI or its clients.