Post

Monolithic work completed at the 200-place kindergarten in Shcherbinka

Monolithic work completed at the 200-place kindergarten in Shcherbinka

Published on: 2026-08-25

Source: Moscow Government – Правительства Москвы –

An important disclaimer is at the bottom of this article.

The installation of monolithic structures and roofing has been completed in the kindergarten under construction in Shcherbinka. This was reported by the Deputy Mayor of Moscow for Urban Planning Policy and Construction. Vladimir Yefimov.

“The readiness of the 200-place kindergarten, which will appear in the Shcherbinka district, is 60 percent. Currently, the monolithic and roofing works have been fully completed, window units have been installed, and external engineering communications have been laid. The builders have started facade finishing, installation of internal engineering networks, and at the same time, landscaping of the adjacent territory is underway. After commissioning, the facility will become part of the Moscow city education system,” Vladimir Efimov said.

Great attention will be paid to the architectural appearance of the building and the landscaping of the territory. The facades will be finished with light mineral plaster with a silicone paint topcoat, as well as ceramic tiles of several colors.

“The kindergarten building is a three-story structure with one underground floor. The total area of the facility is nearly four thousand square meters. There are eight groups planned for the little ones, which will be divided by age. In addition to them, the kindergarten will house multifunctional music and physical education halls, as well as a medical unit with a treatment room and a full-cycle food unit,” added the Minister of the Moscow Government, head of the Moscow Department of Urban Development Policy

Vladislav Ovchinsky.

Moscow City State Construction Supervision Committee monitors the developer’s fulfillment of obligations at all stages of the project’s implementation, including the provision of social infrastructure for the new buildings.

Head of the agency Anton Slobodchikov noted that the committee has been overseeing the construction of the kindergarten building since January 2024. Seven site visits have already been conducted. Specialists have checked the quality of the erected structures and the materials used for compliance with the approved project documentation.

Almost half of the plot area free from construction will be occupied by green spaces. Individual playgrounds will be arranged for each group. In addition, the kindergarten territory will feature a sports area, a place for storing strollers and sleds.

An educational complex for 1,050 places will appear in GolyanovoSobyanin: The new building of school No. 1517 will open on September 1

Earlier Sergey Sobyanin said about a kindergarten with 150 places, which was built on Bazovskaya Street in the Zapadnoye Degunino district.

The construction of social facilities in Moscow aligns with the goals and initiatives of the national project “Infrastructure for Life”. More details about Russia’s national projects and the capital’s contribution can be found at special page.

Get the latest news quickly on the official Moscow city channels in messengers “Maks” and “Telegram”.

Please note; This information is raw content obtained directly from the information source. It is an accurate report of what the source claims and does not necessarily reflect the position of MIL-OSI or its clients.