Published on: 2026-07-20
Source: Moscow Exchange –
An important disclaimer is at the bottom of this article.
20.07.2026 12:52
In accordance with the Methodology for determining NKO NKC (JSC) risk parameters of the stock market and the deposit market of PJSC Moscow Exchange on 20.07.2026, 12:52 (MSK), the values of the lower boundary of the REPO price corridor with settlement code Y0/Y1Dt (down to -123.8%), the carry rate, and the range for assessing interest rate risks (down to -0.15 rubles, equivalent to a rate of 152.28%) of the IVAT (iIVA) security have been changed.
Please be advised; This information is raw content obtained directly from the information source. It is an accurate account of what the source claims and does not necessarily reflect the position of MIL-OSI or its clients.