Post

Financial news: 20.07.2026, 11:33 values of the lower boundary of the REPO price corridor, rollover rates, and the range of interest rate risk assessment for the security SBERP (Sberbank-pr.) have been changed.

Financial news: 20.07.2026, 11:33 values of the lower boundary of the REPO price corridor, rollover rates, and the range of interest rate risk assessment for the security SBERP (Sberbank-pr.) have been changed.

Published on: 2026-07-20

Source: Moscow Exchange –

An important disclaimer is at the bottom of this article.

20.07.2026 11:33

In accordance with the Methodology for Determining NKO NKC (JSC) Risk Parameters of the Stock Market and Deposit Market of PJSC Moscow Exchange on 20.07.2026, 11:33 (MSK), the values of the lower boundary of the REPO price corridor with settlement code Y0/Y1Dt have been changed (to -84.41%), as well as the carry rate and the interest risk assessment range (to -0.722 rubles, equivalent to a rate of 108.95%) for the security SBERP (Sberbank preferred shares).

Please note; This information is raw content obtained directly from the information source. It represents an accurate report of what the source claims and does not necessarily reflect the position of MIL-OSI or its clients.